How it works
Schedule Statistics Plots
Use Cpm Plotter to check the *.Xer schedule statistics in the schedule development phase
These plots are visualizing the schedule statistics with consideration of the Critical Path Method and schedule health metrics. These plots could be utilized to identify the kay schedule metrics which need to be focused on to develop a high-quality product.